Valley Road Bridge - Preliminary Engineering Phase

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

The County of Somerset (lead agency) and the County of Morris, through a federally funded Local Capital Project Delivery Program administered by North Jersey Transportation Planning Authority (NJTPA), have, in close cooperation with New Jersey Department of Transportation (NJDOT) Local Aid District 3, undertaken the replacement of Valley Road Bridge to address structural deficiencies to provide a safe and efficient bridge crossing in conformance with current AASHTO, NJDOT, and Somerset / Morris County design standards and policies.

The Local Concept Development (LCD) phase of the LCPD Program for the replacement of Valley Road Bridge has been recently completed and the project has been approved to advance to the Local Preliminary Engineering (LPE) phase.  A copy of the final Concept Development Report with Appendices A-Z is available as a single PDF file (86MB) and may be downloaded here.

Keep up with this project by checking out the official project website at http://www.valleyroadbridgenj.com/.

H1110_LCD_Project_Website

updated:  3-12-2025

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer